Public Works Defense Department

Construction of two new hangars within the Naval Air Base of Sigonella for the shelter and maintenance of the new Global Hawk aircraft, equipped with services, offices and conference rooms. The area on which the two new hangars stand is about 14,000 square meters while the covered area is about 5,200 square meters. On the south side of the hangars there are two-panel doors, 46 meters wide, which will allow the passage of aircraft to the external maneuvering area which has an area of approximately 6,000 square meters.

NAS SIGONELLA

U.S. Government E.M. Dept. of the Navy (ITALY) 

U.S. MILITARY BASE DAL MOLIN (ITALY)

Design-Build Project for the realization of a U.S. Military Base with 34 Multipurpose Buildings having different functions. The total dimension of the area involved in the project is 600.000sqm, 77.000mq of which is the building area. The main realizations are: barracks dormitories, physical fitness, POV parkings, vehicle maintenance facilities and Brigade Headquarter. Roads, green areas and sport fields are included. The basic concept used in the design work has been the creation of a “Campus” for military personnel (that will be around 3.500 units), ecologically sustainable and able to promote pedestrian mobility inside. This Campus is designed to meet multiple military operational requirements, including support activities.

MILITARY BASE DA MOLIN SCHOOL

U.S. Government E.M. Dept. of the Navy (ITALY) 

Construction of a large school campus serving the US military base in Vicenza. The project, spread over a total area of 116,000 square meters, is made up of outdoor areas with parking lots and green spaces equal to 80,000 square meters, three buildings (reception center for children, elementary and middle schools) and the new entrance to the Village of peace. These structures will replace those in operation inside the Ederle Barracks.The elementary school will occupy a two-storey building of approximately 14,000 square meters and will be able to accommodate up to 1,050 students while the secondary school, built adjacent, will have an area of 7,000 square meters for a capacity of 270 students

Africa Hall UN

Addis Ababa (Ethiopia)

Construction of the main Congress Center of the United Nations Organization in Africa, equipped with all the services and systems connected to a structure of this size.

The main building, spread over an area of 80,000 m2, spread over 4 floors for a total floor area of 40,000 m2. It consists of 6 conference rooms differentiated into a main hall, 850 seats, a secondary hall, 480 seats, and four smaller rooms, 460 seats each as well as two buildings used for parking spread over two levels for a total area of 18,000 m2. There are also meeting rooms, offices, delegate spaces, doctors' surgeries, a 1,400m2 clinic, restaurants, press and TV production centres.

Project Mega II , Mega III , Mega III

Sigonella U.S. Government E.M. Dept. of the Navy (ITALY) 

Construction and expansion of the residential buildings of the American Naval Air Base in Sigonella. In the sector, the construction of the Shopping Center, the School and 7 other buildings for offices and workshops were carried out.